Dry-fitting First Interior Plank

I may be getting ahead of myself, but…

I want to see if this thin marine ply will behave in big 24 inch wide “planks” on the interior. I cut one to size and I’m screwing it down with lath screws and castaway scraps of 1/4 ply to help things into position.

I’ll let it sit for a few days and see if it’s collaborating. So much better to epoxy once after a successful dry-fit.

My forced air respirator is on the way. I will want that feeding me fresh air when I move my fumes inside the boat.

20140122-160841.jpg

20140122-160852.jpg

20140122-160858.jpg

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s