Today I am rebuilding the scaffolding so I can get the space i need to spin the boat.
Originally I planned to lift the boat and then move one of the scaffolding walls out 12 inches. This would keep the gangways generous, but the logistics of moving a load bearing wall out was just too much. In the end I just cut away what I needed to to make spinning the boat possible. Good choice I think.