3rd Mid-ship Element is Up!

P143
P147
P148
P149

With help from a chain hoist I lifted the 3rd mid-ship element into place over the weekend.
I’m thinking one more 3 section mid-ship chunk will be enough.
Weather is great so I’ll be cutting as much as I can to get this next piece done. I’ll have to extend the scaffolding a bit, but a little more mass will be good. I also think the benefit to oxygen in the boat will be a big plus.
I think the time and wood cost is minimal now that I have this mid-ship thing down. 🙂

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s