Today we glued up one complete section of mid-ship. This puts the 6 hull frame assemblies together and locks them down with 4 pieces of marine grade plywood. The plywood pieces offset the gaps between assemblies and provide for a great deal of face-to-face epoxy strength. Lots of dry-fitting and screws, then marine epoxy, then using screws as clamps temporarily during set up times.